Placing Propane Systems (VDS) and Appliances into Operations
Attendees to this program must successfully complete Basic Principles and Practices before receiving certification in this course.
This three day course covers the following specific areas: a brief view of the exterior system covered in 4.1; a more in-depth explanation of testing for leakage, pressure test, leak check, leak test, regulator flow and lockup testing; conducting interior site assessments; review all types of systems and how they operate differently; connecting regulator and/or vapor meter to interior gas piping; leak check procedures; different methods and code requirements for purging air from gas piping; placing appliances into operation; emergency response to uncontrolled releases of propane; identifying venting requirements; validating combustion air requirements; and customer safety education
AVAILABLE DATES:
July 17-19, 2024
Click here to download registration.
Click here to register online.
For more information, get in touch with Laural at 334-358-9590.